Levelling of subsided floors and foundations in residential construction and renovation work

Whether it’s subsided foundations in a residential property, an outbuilding or an extension, or a subsided floor: URETEK guarantees a permanent, quick and straightforward restoration solution for residential construction and housing associations. We take a three-pronged approach:

URETEK FLOORLIFT® for construction companies and housing associations

Using the innovative URETEK FloorLift® method, we can easily restore a subsided living floor to its original level. With this technique, we fill the voids beneath the concrete or foundation slab, and thanks to the elasticity of our material, the building can be raised. In the case of expensive flooring – such as high-quality tiles or historic floors – we work from the outside to avoid causing damage. The URETEK FloorLift® method is quick, simple and causes minimal disruption. It is ideal for building contractors and tenants of housing associations, as residents do not need to move out of their homes whilst the work is being carried out.

URETEK DEEPINJECTION® for construction companies and housing associations

Using the URETEK DeepInjection® method, we reinforce the weak soil layers beneath subsided or unstable foundations. Where necessary – and where possible – we raise the subsided foundations, thereby reducing the formation of cracks in walls and façades. As we carry out the injection work from outside the residential building in most cases, disruption is kept to a minimum. The work takes only a few days, and residents do not need to leave their homes. This is the ideal solution for housing associations and construction companies. This technique is also quick, cost-effective and causes minimal disruption.

URETEK HybridInjection® for construction companies and housing associations

Using the URETEK HybridInjection® method, we reinforce and stabilise subsided and unstable foundations built on soft clay and peat layers. With this technique, we inject our high-performance two-component expansion resin into a specially developed geotextile element with a diameter of 40 mm. Thanks to the expansion force, this geotextile element expands to a diameter of 360 mm. In this way, a solid resin column forms beneath the subsided foundation, supporting and stabilising it. This prevents the foundation from subsiding any further. Disruption is kept to a minimum whilst the re-levelling work is being carried out. A very practical solution for construction companies and housing associations: no demolition or clearance work is required, and residents do not have to leave their homes. URETEK HybridInjection® is not suitable for buildings standing on piles.

Find out more about the URETEK FloorLift® method
Find out more about the URETEK DeepInjection® method
Find out more about the URETEK HybridInjection® method

View before and after photos of foundation raising work on outbuildings

The benefits of URETEK for construction companies and housing associations

URETEK’s lifting methods offer numerous advantages over other methods for lifting foundations and subsided concrete floors. Ideal for housing construction, property renovation and housing associations.